Projects
Landslide stabilization from km 73+150 to km 73+220 and construction of deep drainage from km 72+950 to km 73+110 in the section: "Tarnak - Asparuhovo"
MoreConstruction of sewerage and collector systems toward the existing Waste Water Treatment Urban Plant and water supply system – town of Beloslav
MoreReconstruction of water supply and sewerage facilities on At. Moskov Str. and the crossing with Devnya Str.
MoreStabilization of storehouse of Dimov Company Ltd., located at town of Aksakovo, with the help of gabions and reinforced concrete beam
More"Reinforcement of landslide – bus stop Pisatel, road IV-90023 "Golden Sands - Varna", within which the following facilities will be carried out: PILOT CONSTRUCTION № 1
MoreSite strengthening scheme includes the following facilities and activities: - load-bearing reinforcing facilities: three pile and anchoring constructions and three anchoring construction with total length of 592 m. Installation of 229 piles Ø 600 (total l
Moremore