Transport infrastructure projects
Doubling and electrification of the railway in the Lozarevo - Prilep section - part of the project "Doubling and electrification of the Karnobat - Sindel railway line, in tor Lot No. 2: "Doubling and electrification of the Lozarevo - Prilep section"
More
Major repair of the site: Road III-906 - DYULIN PASSAGE
Major repair of the site: Road III-906 "I-9 (St. Oryahovo - Obzor) - Gyulyovtsa from km 0+000 to km 34+100, with a total length of 34,100 km
DYULIN PASSAGE
Maintenance and repair activities of the republican roads on the territory of the NORTHEASTERN DISTRICT, by separate positions: For SEPARATE POSITION No. 1
More
The renewal of the railway and contact network of the Gurkovo - Tvarditsa I
Renovation of the railway and contact network in the interstation Gurkovo - Tvarditsa
with a total length of 7845m along the 3rd railway line
Contractor: National Railway Infrastructure Company
Modernization of the Pazardzhik - Stamboliyski railway section (part of the Trans-European railway network)
A main electrified double railway line has been modernized, sized for a design speed of the Railway of 160 km/h and a contact network for 200 km/h.
More
Landslide stabilization from km 73+150 to km 73+220 and construction of deep drainage from km 72+950 to km 73+110 in the section: "Tarnak - Asparuhovo"
Moremore