Teams of Transstroy Varna SA are working actively

17 April 2014
The Water pipeline from the shore to the deep-water outfall (discharge) is 2 436 m long, and the length of pipe that is going to be laid in open sea through  dragging vessels and after that controllably submerged is 2286 m.
The specific of the Site demands precise interconnectedness between special marine equipment, diving teams and the activities executed on coast.
Deep-water outfall of the purified waste is an important step in solving the problem with the wastewater that is discharged into the sea by the resorts in the area of Pomorie, Ravda, Nessebar, Sunny Beach, St. Vlas.