Reinforcement of landslide at bus stop Panorama and road І-9- WWTP Golden Sands

Contract № BG 98.10-05.01

Site strengthening scheme includes the following facilities and activities:
- load-bearing reinforcing facilities: three pile and anchoring constructions and three anchoring construction with total length of 592 m. Installation of 229 piles Ø 600 (total length – 2 811 m) and 114 piles Ø 800 (total length 2 186 m), as well as 209 anchors 60 t and 31 anchors 80 t.
- draining activities: drainage in front of the load-bearing strengthening facilities, open water discharging ditches, closed water discharging channels, horizontal probing drainage - 3 pcs of 100 m, 80 m and 90 m and 4 pcs of 50, 70 and 80 m (total length of HPD – 1500 m
- vertical planning: includes terrain sloping and terracing between the load-bearing construction in total volume 16 524 m.
- establishment of 5 technological roads for strengthening scheme realization – with total length 992 m, width 4 m, banks– 2х1 m, with crushed stone covering.