"Reinforcement of landslide – bus stop Pisatel, road IV-90023 "Golden Sands - Varna", within which the following facilities will be carried out: PILOT CONSTRUCTION № 1
![](http://transstroy-varna.bg/assets/projects/medium/p_e44321a0179a08879b36148218c158a7_4adc85b82e83905cf5f8e47f2ec5cf34.jpg)
Stipulated is the construction of vertical type of reinforcement and shifting the structure ledgement 5 meters in south direction, laying of large concrete blocks, called “T-blocks” on the base of detonated rock mass (DRM) and underblock stone filling 15-100 kg. Stone filling 5-15 kg is carried out after the installation of all blocks, then the top surface is formed.