"Reinforcement of landslide – bus stop Pisatel, road IV-90023 "Golden Sands - Varna", within which the following facilities will be carried out: PILOT CONSTRUCTION № 1

The project includes emergency repair works for strengthening and protection of foundations of the roadstead tower, Port Varna.
Stipulated is the construction of vertical type of reinforcement and shifting the structure ledgement 5 meters in south direction, laying of large concrete blocks, called “T-blocks” on the base of detonated rock mass (DRM) and underblock stone filling 15-100 kg. Stone filling 5-15 kg is carried out after the installation of all blocks, then the top surface is formed.