Strengthening of Danube river at area I, Kutovo, km 799500 - km 803500
Contract № BG 98.10-07.I.01
The project stipulates construction of shore strengthening stone-filling dike of the shore of river Danube, on one platform from km 803+500 to km 799+500 with length of 4 km. Dike construction consists of core of detonated rock mass /DRM/ and armoring of stone 15-100 kg. The state dike is crosses at certain places by gravel ramps (3 pcs). The following main types of works will be carried out on the site:
- preparation works (site clearing – 16000 m2, trees cutting – 10000 m2);
- excavation works (excavations – 1150 m3, incl. humus 300 m3, backfilling of soil – 600 m3 and spreading of 300 m2);
- transportation of surplus earth masses to repository – 850 m3;
- filling of crushed stone – 300 m3;
- filling of DRM – 38660 m3;
- stone filling 15-100 kg – 13240 m3;
- levelling and compacting of gravel – 3000 m3;
- other works (according to bill of quantities).
The project stipulates construction of shore strengthening stone-filling dike of the shore of river Danube, on one platform from km 803+500 to km 799+500 with length of 4 km. Dike construction consists of core of detonated rock mass /DRM/ and armoring of stone 15-100 kg. The state dike is crosses at certain places by gravel ramps (3 pcs). The following main types of works will be carried out on the site:
- preparation works (site clearing – 16000 m2, trees cutting – 10000 m2);
- excavation works (excavations – 1150 m3, incl. humus 300 m3, backfilling of soil – 600 m3 and spreading of 300 m2);
- transportation of surplus earth masses to repository – 850 m3;
- filling of crushed stone – 300 m3;
- filling of DRM – 38660 m3;
- stone filling 15-100 kg – 13240 m3;
- levelling and compacting of gravel – 3000 m3;
- other works (according to bill of quantities).