Contract № BG 98.10-07.I.01

The project stipulates construction of shore strengthening stone-filling dike of the shore of river Danube, on one platform from km 803+500 to km 799+500 with length of 4 km. Dike construction consists of core of detonated rock mass /DRM/ and armoring of stone 15-100 kg. The state dike is crosses at certain places by gravel  ramps (3 pcs). The following main types of works will be carried out on the site:
 - preparation works (site clearing – 16000 m2, trees cutting – 10000 m2);
 - excavation works (excavations – 1150 m3, incl. humus 300 m3, backfilling of soil – 600 m3 and spreading of 300 m2);
 - transportation of surplus earth masses to repository – 850 m3;
 - filling of crushed stone – 300 m3;
 - filling of DRM – 38660 m3;
 - stone filling 15-100 kg – 13240 m3;
 - levelling and compacting of gravel – 3000 m3;
 - other works (according to bill of quantities).